Phased replacement

Replacing roofs one phase at a time

Each phase is a few buildings, with its own scope, bid and board vote. The schedule says which buildings come next. A phase is not final until the board approves it.

Between phases we log repairs by building and walk the remaining roofs once a year. If a roof is failing sooner than the schedule thought, the board can move it up.

A two-storey stucco house under construction with roof tiles staged on the roof and scaffolding at the front

A phase, from the residents' side

What happens at each building

  1. 01
    Before

    Step 1: Written notice

    Residents get a notice with the dates, the hours and where to park.

  2. 02
    Day one

    Step 2: Set-up and protection

    Landscaping, pool decks and walkways are covered before any tile moves.

  3. 03
    Day one

    Step 3: Tear-off and deck check

    The old roof comes off and the deck is checked. Rotted sheets are priced per sheet, as the bid says.

  4. 04
    The week

    Step 4: Underlayment and tile

    New underlayment goes down, then the tile is set or replaced, with flashing at every penetration.

  5. 05
    Each day

    Step 5: Cleanup and sweep

    Debris is hauled away and the ground is swept with a magnet for nails.

  6. 06
    At the end

    Step 6: Walk-through and photos

    The board's contact walks the building with the superintendent, and the photos go in the close-out file.

Roofs in a typical community

What the schedule usually covers

  • Tile roofs

    Lift and relay, or new tile, over new underlayment.

  • Foam and flat roofs

    Clubhouses and gatehouses, recoated or replaced.

  • Shingle roofs

    Smaller buildings, such as mail kiosks and pool pavilions.

  • Ramadas and covers

    Shade structures on common ground.

About phased replacement

Who decides which buildings go first?

The board does. We rank the roofs and recommend an order. The board can change it.

Can a phase move up?

Yes. A roof that fails sooner than the schedule thought can move to the next phase, or get a repair that holds it.

Who talks to residents?

We send the notice and give the manager a contact for each building. Resident questions come to the office line.